Volume 12

HYDROLOGY REPORTS PART 2

  •  Elsinore Valley Municipal Water District Urban Water Management Plan,      Final, June, 2016
  •  Lake Elsinore and Canyon Lake Nutrient TMDL Annual Water Quality  Report, Final Report, August, 2015
  • Lake Heating, Cooling and Stratification During LEAPS Operation,         August, 2006
  • Lake Elsinore and Canyon Lake Preliminary Aeration System Report, June,    2004
  • Memorandum, March, 2015
  • Effects of LEAPS Operation on Lake Elsinore: 3-D Hydrodynamic           Modeling
  • Lake Elsinore Water Supply
  • Lake Elsinore Recycled Water Project – Draft 4th Quarterly Report,     September, 2017
  • Lake Elsinore Recycled Water Project – Draft Final Report, November,            2004
  • Results from the Lake Elsinore Recycled Water Monitoring Project
  • Draft Technical Memorandum, Michael Anderson, April, 2015
  • Draft Technical Memorandum, Michael Anderson, June, 2015
  • Lake Elsinore Water Level Sustainability

 

GEOTECHNICAL REPORTS

  • Technical Memorandum No. 3, Preliminary Evaluation of Faulting and            Seismicity, LEAPS, July 18, 2008
  • Technical Memorandum No. 2, Geologic Mapping, LEAPS, July 17, 2008
  • Technical Memorandum No. 1, Summary Report of Existing Information, Geology, Seismicity and Geotechnical Issues, LEAPS, January 25, 2008
  •  Memorandum to U.S. Army Corps of Engineers, Input for United States Army Corps of Engineers Section 404 Permit, LEAPS, November 22, 2006
  • Technical Memorandum, Comments on Issues Relating to Hydrology as Identified in the DEIS, LEAPS, March 31, 2006
  • Technical Memorandum, Comments on Geotechnical Issues as Identified in the DEIS, LEAPS, March 30, 2006
  •  Technical Memorandum, Comparative Review of Geotechnical Conditions at Three Candidate Powerhouse Sites: Ortega Oaks, Santa Rosa and Evergreen, LEAPS, March 24, 2006
  • Phase I Work Plan, Preliminary Geotechnical Investigation, LEAPS, June 10, 2005
  • Report on Water-Quality Sampling Events 2004-05 Wet Season, LEAPS, May 31, 2005
  • Geotechnical Feasibility Report, LEAPS, August 28, 2003
  • Supplemental Report, Conceptual-Level Dike Breach Inundation Study, LEAPS, December 12, 2003
  • Supplement No. 1 to Geotechnical Feasibility Report, October 16, 2003
  • Conceptual-Level Hydrology Study, LEAPS, August 28, 2003
  • Conceptual-Level Inundation Study, LEAPS, August 28, 2003